![]()
PROJECT DEVELOPMENT FACILITIES
- Concrete Roads and Alleys
- Concrete Curbs & Gutters
- Underground Drainage
- Meralco Facilities
- Project Perimeter Fence
- Centralized Water Distribution System
- Play Area
Specifications for Complete:
- Cast In Place Reinforced Concrete Walls
- Painted Plain Cement Finish for Exterior and Interior Walls.
- Manufactured Slone Cladding Accents at Front Elevation.
- Concrete Roof Tiles on Steel Roof Framing with Gutter.
- Steel Casement Windows With Grills at Ground Floor
- Painted Front Panel Door & Painted Flush Doors for Service Entrance
- Ceramic Tile Floor Finish for the Living Room, Dining Room and Kitchen
- Vinyl Floor Tile Finish for all Bedrooms
- Painted Fiber Cement Board Ceilings for 1st & 2nd floor with Comice
- Painted Flush Doors in all Bedrooms and PVC Door for T&B
- Painted Fiber Board Cement Board for Double Partitions in all Bedrooms with Baseboards
- Tiled Kitchen Counter with Stainless Kitchen Sink and Base Cabinet Doors
- Tiled Floor and Walls for T&B
- Water Closet, Lavatory & Shower Head in T&B
- Steel Stringer, Wood Treads and Steel Hand Rail for Stairs
- Painted Concrete Perimeter Fence with Steel Gate
- Concrete Paving Blocks for Pathwalk and Grass Pavers for Tire Strip at Parking Space
Not included in semi-complete:
- Plants & Landscaping
- Cabinets & Closets
- Lighting Fixtures


